Two Tier Mezzanine Floor Case Study
MPC Systems were asked to extend an existing clients two tier Mezzanine floor. The installation was carried out to a extremely tight schedule working 24 hour shifts to complete the floor within 2 weeks. The floor was designed with an anti slip floor finish. The perfro handrail system and main steel work were painted in our clients corporate colour.
MPC systems undertook the building control approval and worked alongside the electrical and sprinkler contractors to make sure that the project was completed on time and to budget.